Applicants must submit a table with information on all proposed interconnection points for the network. This table has three required fields: Point Name, Latitude and Longitude (see descriptions below). Additional fields specified in the included formats specified in this template are optional or will be added by NTIA post application processing.
We’d love any feedback. Submit here